Jerai starts from one assumption: some maritime infrastructure is measured often enough that measuring it continuously could be worth paying for. Before asking anyone to believe that, I wanted to check it against public data.

When someone surveys or inspects the seabed where ships move, the Marine Department (Jabatan Laut Malaysia) usually publishes a notice to mariners or a port circular. Those notices are public. So I collected every one from January 2023 to 25 November 2026 and kept the ones about hydrographic and bathymetric surveys, geophysical surveys, underwater inspection and dredging.

Most survey work is offshore

Original survey and inspection notices per year (dredging and seismic counted separately)
YearAllOffshore and open waterPort and nearshore
2023907812
20241068620
20251409743
2026, to 25 Nov14910148
Total485362123
Part of the rise is likely better publishing by the department, not only more work.

Three quarters of the notified work is oil and gas blocks, pipeline routes and subsea cables. Ports, jetties, channels and moorings are the smaller part: 123 notices in almost four years, across 43 named sites.

A few sites come back again and again

Port sites with the most repeat survey or inspection notices
SiteNoticesPeriodTypical gap
Petron single buoy mooring, Port Dickson13 inspectionsSep 2025 to Nov 2026About 3 weeks
Petron jetty, Port Dickson8 surveysDec 2025 to Sep 2026About 3 weeks
Tanjung Pelepas port limits13 surveys2023 to 2026About 12 weeks
Johor Bahru port limits5 surveys2023 to 2025About 13 weeks
Sungai Udang port limits, Melaka6 surveys2023 to 2026About 14 weeks
Typical gap is the median number of days between notices at that site. Tanjung Pelepas groups several areas inside the port, so it is a port, not one berth.

Most sites do not repeat like this. Half of the port sites (21 of 43) appear once in four years. Channel surveys at Port Klang come back roughly every nine months, and at Kuala Kedah and Kuala Perlis about every two years, often around dredging.

Across port sites with more than one notice, the typical gap between surveys is about 100 days once notices for the same campaign are merged.

Autonomy is almost absent

Only 7 of the 361 notices I could read in full mention an uncrewed boat, an underwater robot or an ROV. One of them is in a port: an autonomous survey boat used for a subsea pipeline site survey at Kerteh in 2026. The port circulars I read by hand list small crewed boats.

What this means for the thesis

The broad version of the idea, that every Malaysian port wants its seabed measured continuously, is not supported by this data. A narrow version is: a small number of high value assets, mainly single buoy moorings, oil jetties and the largest container ports, are surveyed or inspected every few weeks to every few months.

Two honest caveats. The Port Dickson rhythm covers only 2025 and 2026, so it could be one programme rather than a permanent pattern. And the owners of these assets already hire survey firms job by job. Anything continuous has to beat that on cost or speed, and notices cannot tell us whether it would.

So the next step is not a boat. It is conversations with the people who run those few recurring sites, and with the survey crews who serve them.

What this data cannot see

  • Notices only cover work that needs a warning to shipping. Routine soundings inside a port’s own basin, private jetties, rivers and diver inspections may never appear.
  • Busy ports such as Westports, Northport and Penang barely show up. They almost certainly survey more than this suggests, under standing arrangements or without circulars.
  • The circular listing has no Sabah port circulars and very few for Sarawak and Labuan.
  • About a quarter of rows have a title and date only, because the PDF was scanned or missing.
  • Site groupings are judgement calls, and one notice can cover three days or three months.

If you run one of these assets, or survey them, and this reads wrong to you, tell me. That is the point of publishing it.

Harith