Jerai starts from one assumption: some maritime infrastructure is measured often enough that measuring it continuously could be worth paying for. Before asking anyone to believe that, I wanted to check it against public data.
When someone surveys or inspects the seabed where ships move, the Marine Department (Jabatan Laut Malaysia) usually publishes a notice to mariners or a port circular. Those notices are public. So I collected every one from January 2023 to 25 November 2026 and kept the ones about hydrographic and bathymetric surveys, geophysical surveys, underwater inspection and dredging.
Most survey work is offshore
| Year | All | Offshore and open water | Port and nearshore |
|---|---|---|---|
| 2023 | 90 | 78 | 12 |
| 2024 | 106 | 86 | 20 |
| 2025 | 140 | 97 | 43 |
| 2026, to 25 Nov | 149 | 101 | 48 |
| Total | 485 | 362 | 123 |
Three quarters of the notified work is oil and gas blocks, pipeline routes and subsea cables. Ports, jetties, channels and moorings are the smaller part: 123 notices in almost four years, across 43 named sites.
A few sites come back again and again
| Site | Notices | Period | Typical gap |
|---|---|---|---|
| Petron single buoy mooring, Port Dickson | 13 inspections | Sep 2025 to Nov 2026 | About 3 weeks |
| Petron jetty, Port Dickson | 8 surveys | Dec 2025 to Sep 2026 | About 3 weeks |
| Tanjung Pelepas port limits | 13 surveys | 2023 to 2026 | About 12 weeks |
| Johor Bahru port limits | 5 surveys | 2023 to 2025 | About 13 weeks |
| Sungai Udang port limits, Melaka | 6 surveys | 2023 to 2026 | About 14 weeks |
Most sites do not repeat like this. Half of the port sites (21 of 43) appear once in four years. Channel surveys at Port Klang come back roughly every nine months, and at Kuala Kedah and Kuala Perlis about every two years, often around dredging.
Across port sites with more than one notice, the typical gap between surveys is about 100 days once notices for the same campaign are merged.
Autonomy is almost absent
Only 7 of the 361 notices I could read in full mention an uncrewed boat, an underwater robot or an ROV. One of them is in a port: an autonomous survey boat used for a subsea pipeline site survey at Kerteh in 2026. The port circulars I read by hand list small crewed boats.
What this means for the thesis
The broad version of the idea, that every Malaysian port wants its seabed measured continuously, is not supported by this data. A narrow version is: a small number of high value assets, mainly single buoy moorings, oil jetties and the largest container ports, are surveyed or inspected every few weeks to every few months.
Two honest caveats. The Port Dickson rhythm covers only 2025 and 2026, so it could be one programme rather than a permanent pattern. And the owners of these assets already hire survey firms job by job. Anything continuous has to beat that on cost or speed, and notices cannot tell us whether it would.
So the next step is not a boat. It is conversations with the people who run those few recurring sites, and with the survey crews who serve them.
What this data cannot see
- Notices only cover work that needs a warning to shipping. Routine soundings inside a port’s own basin, private jetties, rivers and diver inspections may never appear.
- Busy ports such as Westports, Northport and Penang barely show up. They almost certainly survey more than this suggests, under standing arrangements or without circulars.
- The circular listing has no Sabah port circulars and very few for Sarawak and Labuan.
- About a quarter of rows have a title and date only, because the PDF was scanned or missing.
- Site groupings are judgement calls, and one notice can cover three days or three months.
If you run one of these assets, or survey them, and this reads wrong to you, tell me. That is the point of publishing it.
Harith